Tuesday, September 23, 2014

Strip, shingle and oak cabinets.

apples the bears didn't get
My back feels much better,  I tried so many things to get it back to normal. One thing for sure is that I couldn't lie around for long,  I had to get out and walk around.   I laid on a heat pad,  I stretched, rolled on a firm roller, laid around on an inflated ball, bounced around on my toes, hung from things. It seamed like I was trying everything, I guess what it needed most was time and water...drinking more water is so important.  One day I took the loppers and cut scotch broom that was encroaching on a pair of wild apple trees next to a maple and some oaks. After that session it started to improve.



choosing paint colors
I finished stripping the paint from the ceiling in the music room, hallelujah! The only thing left to strip now is a couple of doors. Alex worked his mudding skills over the sheet rocked walls and Becky is hard at work sanding and priming. She has picked up a half dozen paint samples to try out.



ladder scaffolding
I started shingling a wall at a clients shop. I am using western red cedar #1's for the wall and placing them in a random pattern rather than straight courses. I love the look of shingles. For a square (100 square feet) they run about $250, a square is four bundles, this project is about two squares of shingles.



face frame and side panels

I am moving along with the oak upper cabinets. I had to order a 3/16 rabbeting bit because the plywood I got to match the existing cabinets is only that thick, (it is actually a hair under 3/16) so I got an 1/8 inch bit too. Face frames and side panels are glued up and have finish, door frames are made but need panels and carcasses need to be cut out of melamine.


No comments:

Post a Comment