Friday, November 15, 2013

Sashes to Kitchen

Last night I glued up the rest of the thirty three sashes for downstairs. Next week I'll tackle the remaining sashes for upstairs. Between now and then I hope to install a Murphy bed on Monday and wrap up the first draft of the Windy Nip kitchen. Besides the paying jobs there are a few things I would like to accomplish in the near future. At least before Thanksgiving.


I'm looking over a list I made this morning. In the studio I would like to put blocking in between the loft joists and cover up all the unsightly electrical Romex. There is a hole in the wall behind the kiln to cover and baseboard in the bathroom. It has only been about 6 years since it was ready for baseboard. Last but first on the list is a closet around the breaker panel by the drafting table. I pulled an old barn door out of a pile under the cypress trees that might work for that.


Then I made a quick list for the house. Hook up the sink in the half bath, install the baseboard and hook up the proper light. My temporary light fixtures can last for years. (Still haven't replaced the two wall lights under the loft in the shearing shed.) Make slats for the bed in Oli's room, and finish the shelves in the pantry. I have my work cut out for me, better stop wasting time on this here N-7.

No comments:

Post a Comment